Case Study: Hospital Laboratory Power Outage

100KW critical cooling keeps hospital running

June 2017


During a planned power outage at the hospital, the air conditioning to the pathology laboratory was going to be temporarily shut down. This presented a significant challenge as the laboratory is vital to the functioning of the hospital and a reliable solution was essential to maintaining these critical services throughout this time.


Airflo designed and supplied a complete cooling and power solution, incorporating a 100KW water chiller, four compact air handling units and a generator. The system was installed without disturbance to the laboratory staff and successfully maintained a steady temperature in the laboratory for the duration of the outage.


The client was delighted at the outcome and is continuing to work with Airflo on future projects across a number of sites.

 Airflo Envirorental Ltd

Bank Street

Doncaster

South Yorkshire

DN1 3RB 

 Tel. 01302 730000

Email. hiredesk@airflorental.co.uk 

image-053.png
BSI-Assurance-Mark-ISO-9001-2015-KEYW.pn
image-051.png

FS 708577

 

Copyright © 2019 Airflo Envirorental Ltd

Registered in England and Wales No 10684950

Registered office: Prospect House, 4 Old Station Close, Shepshed, Loughborough, Leicestershire LE12 9NJ